Updated 3/30/2013:

 

  • Laid the final track for Standard Slag and trimmed it to the proper length.  There is now correct spacing for the compressed air tank and the end-of-track bumper.
  • Laid the final piece of track for Weirton Junction.  I still need an Atlas track bumper.
  • Got the backs of a number of steel pilings painted.  I used the same color as on the front - Krylon Ruddy Brown primer.
  • Heated 4 of them with a hot air gun and bent them to fit the curved edge of the Standard Slag module.
  • Trimmed one piling to bridge two different height plywood steps on the module.  Also filed down the joint compound at that spot.

I've decided to stop work on the module when all the steel pilings are in place.  I will leave ground cover and the build-up of adjoining terraforms to the very end.  This module will probably have to come out at least 1 more time to reach two areas (Crawford's Crossing Highway overpass and Strip Steel mill). 

 

The next mini-project to get some attention will be Crawford's Crossing Highway overpass.

 

George