Skip to main content

Reply to "PRR Panhandle Division"

Updated 3/13/2009...

Latest photo shows my hidden yard under construction. Ignore the date on the photo, I took the picture tonight. The yard will hold around 50 cars and will be accessible via a long descending spur. Construction details:
- Vinylbed (1/4" as per yards; 3/8" for mainline)
- Ross switches w/ DZ-2500 switch machines (TMCC controlled)
- Balloon reversing track with 4 stub end tracks inside
- Curves are all O31
- Track is mostly GarGraves, with some Ross sectional curves

George
Last edited by G3750

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×