Skip to main content

Reply to "PRR Panhandle Division"

Updated 6/5/2009...

I finished laying the track for the hidden storage yard last night. There are end-of-track occupancy leads for every stub (all 4) as well as track bumpers. I've got automotive terminal strips under each stub for easy connection to lights somewhere on the layout. My thread in the Scenery Forum (dumpy hotel) is related.

I've uploaded a new photo (new #10) which shows the completed trackwork for this part of the layout (see Photos 7, 8, 9, 10 for stages of construction). I still need to wire the track (connect the feeder wires hanging down under the table). All track feeder wires will attach to a large terminal strip which will be wired to the western power distribution panel.

Next steps will be to wire and program the DZ-2500 switch machines, lift the yard to its correct height, and connect the yard lead track.

But we're getting there. Wink

George
Last edited by G3750

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×