Updated 5/6/2015:
Finally managed to get some work done on the layout:
- Moved the original cross-members in the river bottom benchwork module.
- Installed extra cross-members in the river bottom.
- Procured regulated 12VDC and 5VDC power supplies to replace the unregulated power supplies procured from old computers.
- Ordered 100' of Yellow/Black 16 gauge 2-conductor zip cord for use with the 12VDC power supply.
- Ordered 100' of Red/Black 16 gauge 2-conductor zip cord for use with the 5VDC power supply.
- Wrapped and suspended the wire bundle that goes behind the central backdrop (under the Hidden Passing Siding).
George