Skip to main content

Reply to "PRR Panhandle Division"

Updated 5/6/2015:

 

Finally managed to get some work done on the layout:

  • Moved the original cross-members in the river bottom benchwork module.
  • Installed extra cross-members in the river bottom.
  • Procured regulated 12VDC and 5VDC power supplies to replace the unregulated power supplies procured from old computers.
  • Ordered 100' of Yellow/Black 16 gauge 2-conductor zip cord for use with the 12VDC power supply.
  • Ordered 100' of Red/Black 16 gauge 2-conductor zip cord for use with the 5VDC power supply.
  • Wrapped and suspended the wire bundle that goes behind the central backdrop (under the Hidden Passing Siding).

George

 

Last edited by G3750

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×