Skip to main content

Reply to "PRR Panhandle Division"

Updated 5/8/2015:

 

Here are some photos to accompany the previous update.

 

First, the river bottom module and its new cross-members.

 

Wiring_21_

Wiring_20_

Next, the regulated power supplies.  5VDC on the left; 12VDC on the right.  Note that you can buy these new for very little coin.  They are much safer than using unregulated computer power supplies.

 

Wiring_25_

Wrapped and suspended the wiring bundle under the Hidden Passing Siding.  This looks a lot better to me now.

 

Wiring_24_

Wiring_23_

Wiring_22_

OK, now we need to make sure that the river bed module is actually level and properly positioned / attached to its legs (see Photo 1 for reference).  In order to have the backdrop and bridge piers fit correctly, we will need to have the module level left to right and front to back.  That's the logical next step.

 

George

Attachments

Images (6)
  • Wiring_21_
  • Wiring_20_
  • Wiring_25_
  • Wiring_24_
  • Wiring_23_
  • Wiring_22_
Last edited by G3750

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×