Skip to main content

Reply to "PRR Panhandle Division"

Updated 2/7/2016:

Over this weekend, I did a little work on the layout:

  • Picked up some Plastruct for the Strip Steel building at Cool Trains.
  • Did a little more re-organizing and drawing correction for the manual.
  • Showed the layout to my sister and brother-in-law who were in town for a short visit.
  • Cut and installed a 12" straight (replacing the 9.5" one) on the Coal Mine Spur. Started working the placement of the curve.  As you can see in the photo below, I am going to have to re-align the subroadbed.

DSCN1403

The re-alignment was not the desired outcome.  Unfortunately, when the location of the bridge approach tracks was finally correctly fixed, the need for a re-alignment became obvious.  So all that careful template work was for nothing, and I am back to fitting pieces of plywood under the track to support track.    I am going to have to get creative about this.

George

Attachments

Images (1)
  • DSCN1403
Last edited by G3750

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×