Skip to main content

Reply to "PRR Panhandle Division"

Updated 5/11/2012:

 

Made some more progress over the last day or so.  Switch #11 is now in place and mated to the mainline.  The mainline now extends from the bridge to Weirton Junction.  I am in search of 1" track screws to tighten down the entire length of track.

 

Next steps are to complete the sandwich area (bottom floor of the slag pit) and paint the entire area a slag gray / white color.

 

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×