Skip to main content

Reply to "PRR Panhandle Division"

Updated 7/2/2012:

 

There has been some progress since I last reported here:

  • Foamboard has been laid down on the access hatch and roughly carved.  Joint compound will be applied next to smooth out the slopes.
  • I've acquired some slag from Scenic Express that will cover the slag yard in, well, slag.  That's prototypical.
  • I now have 12 resin sections of steel pilings that will act as the walls to hold up the slag yard.  I just painted them a Ruddy Brown shade with Krylon paint.  They look pretty good, if I say so myself.
  • A "plug" of foamboard has been created to fit into the north end of the access hatch (slag yard).  I got out the Foam Factory last night and carved it.  It will be faced with steel pilings.

The way I see things right now, when I need to remove the hatch, the plug will come out first, the electricals will be disconnected, and then the access hatch will pivot out and away from the layout.

 

George