Skip to main content

Reply to "PTC and mainline Steam?"

superwarp1 posted:

 We all know that if steam is to ever run in PTC territory the steamer itself will have to have it installed.

My question is how will it work?

Hopefully MUCH better than what is currently being used on the freight railroads.

 Has someone come up with a design yet?

Pretty much, yes.

 Anyone in the know, know the cost of such a system?

Yes, the Forth Wayne Railroad Historical Society has pretty well worked the costs out.

 I’m sure each steam engine will be different?

Why? They all should be able to use the same design.

  Will it be a big rubber mallet that bonks the engineer in the head to let him know he ran a signal?

Sounds logical.

 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×