Skip to main content

Reply to "Question about common/ground"

@KarlDL posted:

Pulling solid through conduit is, well, challenging, to say the least.  So stranded is pretty much standard there.

You win that round!  I saw a pair of guys trying to pull solid wire through a conduit for my septic system installation, they finally gave up and got stranded wire. I'm not sure why they started with solid, I can only suppose they already had it on the truck and didn't want to make a trip for the right wire.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×