Skip to main content

Reply to "Question about derailments"

Any derailment runs the risk of overshooting the edge of the layout. In the case of 0 gauge, the heavier equipment tends to want to continue moving after that derailment. The solution is to either crawl at slow (some say prototypical) speed or be safe and put up a guard rail / other barrier. The type of track in my experience doesn't much matter. I built a perimeter guard rail out of 1/2" PVC pipe with a jacket of 3/4" pipe insulation on my layout - and sorry, I don't have the capacity to do pictures. Some people here use plexiglass.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×