Skip to main content

Reply to "Re-wiring Layout"

Arnold a few thoughts. Are you planning on keeping the operation of the layout the same? As far as existing blocks, switch locations, operating tracks, etc? If so, I would start with attempting to draw an as built wiring configuration drawing as you trace out and disconnect the wiring. Next I would redraw it in a more organized fashion based upon how you are using the terminal strips and power supplies. In doing so, you can develop your wiring color code, labeling system and organize your wire routing. Good luck and don’t procrastinate the sooner you begin the sooner the trains will be running again!

Well thought out and well stated, Rich.

I plan to keep the same track configuration and have the operation of the layout the same, but may expand it by adding 2 more sidings on the far left side of the layout. Those sidings will have a 2 stall engine house and a large custom built Lionel Factory I got 2 months ago from a LHS.

The expansion, if it happens, will happen after the layout is re-wired in a way the provides for the potential for that possible expansion.

Drawing the wiring configurations and labeling the wires are great ideas.

Last edited by Arnold D. Cribari

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×