@PRR1950 posted:Given the equipment size you are running and plan to run, I think your power supply should handle it, given how you plan to wire it.
Chuck
Thank you Chuck,
On my previous 4x16 layout there were 2 loops with feeders only at the ends of each loop with 9 switches. With 2 trains running I had no problem metering 18v throughout.
Gene