Last night the tracks and upper platforms were removed from the main platform and the snow material placed down over the light strings.  The tracks were reinstalled and feeder wires run to the terminal blocks beneath the table.  My Lionel TMCC 2-6-0 did the honors as the test locomotive and ran perfectly around all three main level tracks.  Later this week we'll fasten the track down and install the last few pieces of the Christmas light strings where needed around the table edges.  The upper level tracks and lights are left in place from year to year, so those just need to be hooked back up and will be ready to go.