Skip to main content

Reply to "Redford Theatre Christmas Trains 2021"

Life has been busy so this is a bit of a delayed update, but things have been slowly progressing at the Redford Theatre. We took a week off since I came down with a mild cold a couple weeks back, however last week I knocked out one of the more time consuming parts of the layout by installing the light strings for backlighting the snow. It's not exactly a difficult job, but it is one that requires rather meticulous work to ensure that they look fairly even when the snow is laid down on top.

Tonight we'll pull the track back up, place the snow material down over the lights and then do a final install of the track on top after I fix some feed wire solder connections on a few track sections. After that we should be about ready to move on to unpacking and placing buildings and other accessories.

IMG_3686

Attachments

Images (1)
  • IMG_3686
OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
330-757-3020

www.ogaugerr.com
×
×
×
×
×