Skip to main content

Reply to "Request for feedback on FasTrack layout(s)"

@Pappu posted:

Thanx @DCtransit! Yes, that seems like a great plan. I believe I saw some updates to that done by Ken (@Ken-Oscale) and trying to see if I can find that plan for SCARM.
Does the current D264 allow a 2 train run? If so, running an elevated loop would give it a 3 train operation.

Yes it does allow for 2 train operator. I would try to adjust the elevated risers so you can tie in a reversing loop on that inner loop (or try to convert the elevated section to a reversing loop)

As far as a 3rd elevated loop, in theory you could stack it on top of the outer circular loop, but it may be too much and not look right. (I have been dying to get my hands on the vintage  Marx's elevated trestles that allows you to stack trains and run them one on top of another. Too expensive and might have to make my own

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×