Skip to main content

Reply to "Rio Grande Tennessee Pass May Reopen"

I have serious doubts. I have hi-railed a small part of the line in the past. There are miles and miles of removed track that would have to be replaced. All the signalling equipment has been damaged with target practice or removed. Conflicting miles with a couple of short lines that use a portion of what is left. Reworking all the roadbed. This new company that wants to reopen the line better have some deep pockets.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×