Skip to main content

Reply to "Roadbed Question"

Jim, I understand you to say that you use a screw through the track to hold the road bed to the table and when you have a turnout, you glue the road bed to the table and let the turnout "float" on the road bed secured only by the rail connections of the turnout to the connecting track.  You don't have any problems with the turnout shifting around over time?  I have a ScaleTrax double crossover on my layout.

 

Double Crossover

 

I'm wondering if I secured the crossover and the two 10" straights that I could let the (4) turnovers "float"?  Again, I really do not want to glue the turnouts and screwing them could cause operational problems.  I guess I'd start out be letting them "float" and see what problems I run into.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×