Skip to main content

Reply to "Securing Fastrack to plywood"

I use one screw per Fastrack section. What with the known issues of electrical continuity I don't want that track moving at all. I have learned to be very cautious and to draw screws down until the track is juuuuust snug on the decking, most especially if a screw is applied to a track switch (which happens only when adjacent track sections don't have screw holes).

At the switching-speed trains mostly move on the PER noise just isn't an issue.   I enjoy listening to the wheel-clicks on the rail joints and with locomotive sound on at low volume everything sounds good to my ear.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×