Skip to main content

Reply to "Show Us Your Track Plan"

The mainlines are just as the plan shows. The engine service tracks were modified a bit, but I never updated the track plan. The TT and RH were moved closer to the front edge of the layout, so there was no room for the lead tracks going to the diesel house. There are now 4 whisker tracks outside the RH on each side.

 

The diesel house is now in the front to back direction, with the lead coming off the right side reverse loop (the pink track on the right). There is a lead for the stoage tracks right in front on the TT leading to the bottom right corner of the layout.

 

The left side of the layout where the industry tracks are shown....is still under construction. Tracks will be placed based on structure size and placement. 

 

 

Final Revision II

Attachments

Images (1)
  • Final Revision II
Last edited by Former Member

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×