Skip to main content

Reply to "small to med size mining building"

Edit Add:  The retention walls are part of the kit.  You have a fair amount of work creating the hill side.   Here is a picture of the construction of the Cabin Creek model.

Takes some time, and a small band saw to cut parts.  I was fortunate there were only two or three foundations to model. Small blocks of clear pine work well/painted.

Note that the model is modular, easy to move and work-on.  I've always believed that a very good model foundation is a plus. 

Last edited by Mike CT

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×