Correction for an existing layout/Fort Pitt Modular group. Using Gargraves track/Ross switches, eventually the joints loosen, from the continual use. Improved track conductivity was done by soldering each joint in place. A small piece of 18 ga solid wire was solder across each track joint. (3 solder joints, all three rails). Done instead of ripping all, and starting over again.
|