Skip to main content

Reply to ""South Fork Railroad" begins!!"

Mark Boyce posted:

Craig,

It is looking great!  First layout?  You are doing great!  Worth the wait!  I'm so glad you have that attitude.  Many folks would be upset if they had to wait so long!  I love the J 611.  I have a PS3 one, and can't wait for access to our last daughter's room when she gets married this year.  Looking forward to your updates.

Thank you Mark for the encouragement.   One main line wired and tested today in Conventional  mode.  Testing for continuity and everything is working.   Will wire next two Mainlines, test, then hookup panel that enables DCS, LEGACY/TMCC & Conventional operation.   Then to 2nd levels(turntable/Spurs/yards and NYC areas. One problem area Atlas 072/054 turnout. Older Lionel engine with two pu rollers only on one truck is stalling in switch.  Will test newer model engine for results.  Hopefully I can get turnout to work properly since it is on main level under an upper level and is hard to reach.

 

Last edited by W&W

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×