Skip to main content

Reply to ""South Fork Railroad" begins!!"

Thank you Sully & RTR12 for the kind words.

I did learn a lot from this forum after starting my layout. From the beginning I knew I wanted to focus on the NYC Grand Central Terminal with as close a copy of the Met Life building behind the GCT.  I am pleased how that scene turned out.  I also knew what trains/accessories I had collected thru the years, therefore I wanted to use as much of my collection that I could.  I accomplished using a lot, but I ran out of space.  I also knew I wanted 3 mainlines to enable running a minimum of 3 trains at once.  I can run 6 fairly long trains.  I also knew I wanted as many yards I could squeeze into the plan to enable storage of cars/engines.  I have some long yards, but I wish I had more. Backdrops were my hardest thing to find. I knew what I wanted, but couldn’t find it.  What I ended up with is close.

I have been lucky to find vendors who helped me with accomplishing my wishes.

I basically knew what I wanted from the beginning, and for the most part have to date accomplished my wishes. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×