Skip to main content

Reply to "Southern Railway G-2 2-8-0 bash"

Major milestone today - the pilot assembly is now back attached to the frame.  I cut off the original pilot below the beam, attached a new one, added some other details, and re-engineered it so it's both lower and shorter (from the cylinders).  Those are the classic compromises for 3-rail operation, and it the engine will no longer work on O42 as advertised, but it does fine on my O64 and looks like it could do a little tighter.  Here you can see how I attached things (JB Weld, what else):

DSCN4374

Next I put the saddle in place, which was also lowered and a new collar installed to make up the difference on top:

DSCN4380

A test to see how it all fits together.  The changes make the look of the cylinder/pilot area a lot less toylike, and to my delight (and a bit of surprise) it all worked well on a test run. 

DSCN4379

Now things will go easily - it's all cosmetic.  A pile of detail parts on my layout will gradually be attached to the locomotive.

 

 

Attachments

Images (3)
  • DSCN4374
  • DSCN4380
  • DSCN4379
Last edited by 49Lionel

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×