Skip to main content

Reply to "SP Steam video"

Hi, What I was told and what I saw was that one tube was going to be installed from the fireman's side to the engineer's side toward front of firebox high up that will allow water in the staybolt area to move more freely.  Looking through the cut firebox hole, one can see the welded bracket that this tube will fit into.  Another tidbit that you might have been involved with was a load of oil given to 4449 that had water in it.  A fire in the firebox was made using wood. The water in the oil was purged this way.  Can you elaborate?  

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×