Skip to main content

Reply to "Starting a new layout"

Another option as I am a fan of the Missabe route, is one or two of the old SD18's that Lionel did, they are affordable as is the bay window caboose.  Then get me a bunch of ore cars to pull.  Granted those engines are not pul-mor equipted sadly, if I remember right, they run ok.  Just looking at options.     I am thinking, if I change the siding to curve back to the right as soon as it diverges off the main, I can use a Lionel trestle leg set to climb up and over the main at the rear to a faux "ore dock" in the frame area on the wall at the rear.  Just need to move all the "stuff" that is stored back there.  The question would be, could I do it and retain the fold up ablity of the table.  It nolonger fully closes against the wall frame, but shuts to the 3/4 point with a pair of chains that hook on each side.  Granted I rarely ever fold this thing shut as there is so much stuff stored under it now!   Hmmmmm.  I am sure a pair of powered SD18s could shove a string of ore cars up hill to the dock.  Be nice if the dock could be 2 tracks wide, shove loads up, then pull empties out.  I would have to set up remote uncoupling as you all but cant reach back there.  So maybe single track is best for less derailment chances that a switch might cause.   AD

Last edited by artfull dodger

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×