How big is the reverse loop?  Could it hold two trains?  If so, you could have the relay shutdown one section in the reverse loop.

I don't have a full diagram yet, it is a work in progress.  I am thinking of using 3 or 4 block sections on the red line.  The green would be manually shut off via a switch.  I was thinking of using automatic switching when a train is occupied in the green line, but that starts getting more complicated than I wanted for now.  I want to start with a basic automatic block configuration so I can have two trains running on the red line and two on the blue line, and they won't crash into each other.  Once I get farther along, I'll provide more updates on what I did.

I think my blocks will be 5 to 6 feet long each.