Skip to main content

Reply to ""ALL IN""

Alex, I designed the bridge so that it can be taken out with ease.  The track is glued to pieces that I bent to the same radius as the curve, so it acts like one large rigid curve which just lays on top of the bridge.  After the removal of a few track screws, the track can be removed then the bridge removed.

I have A LOT more work to do on the scenery around and behind the trestle.

Darren

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×