Skip to main content

Reply to "Station Carts for 356 Operating Freight Station"

Final update.  I got the replacement pads installed on the 2 original carts, and now the slow one moves faster than the fast one.  It turns out that I couldn't get any 2 of the 3 to sequence correctly due to the speed variations.  However, I did get the 3 cart configuration to work successfully.  Cart 3 would come into the shed with carts 1 and 2 in there already, release 1, and then 1 does its thing around the track, releases cart 2, and so on.  I ran that for over 5 minutes without a hitch, so it's ready for display.

I spent some time customizing the carts.  I detailed some suitcases (painting the handles and latches), added some unit numbers to the back of the cart, added a much needed 'Keep Off' sign on the sides of the cart, painted the exposed axles, and then gave the little guys some eyes.

I know, kinda lame, but it gave me something to do.IMG_4453

Attachments

Images (1)
  • Detailed Carts

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×