Skip to main content

Reply to "Station siding electrical question"

Described here. Further relays and a timer can provide soft stop and start and time delay between trains.

 

http://www.jcstudiosinc.com/BlogShowThread?id=856&categoryId=426

 

 The electronic part is easy to do. The above link is harder to explain than to actually do. Do not be intimidated it is simple switching. The more serious problem with automating a siding is the reliability of the switches. I purchased a pair of the new of Ross O tubular at York to mate with my K-Line Shadow rail. Steve assured me his switches were reliable and derailment was not an issue.. I will be doing the above circuit on the layout I am building with added soft start/stop circuits.  I am still laying track for 6 loops. Since the layout is about 1400 sq feet it will be a while.

 

Dale H

Last edited by Dale H

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×