Skip to main content

Reply to "Steel Mill Time Switchlist"

My slag line is on the same track as my dust collector so it is more of a logistic situation for me.  I admire what you are doing!

Thanks Dave! Talking about your mill at your shop helped me decide it was a project worth pursuing. I enjoy the history of the industry/my hometown so putting that knowledge to work is just bonus for me.

My dust collector has a dedicated track behind the furnaces. You just made me realize though, that I have 3 dust collectors on one track. Hopefully that turns out to be an operational opportunity instead of a crisis. Somebody in another thread advised against a fast clock (which was my original plan). They basically said an event driven schedule might add flexibility to the layout and I'm inclined to agree with them. The tricky bit is that dust collection isn't in the flow of raw material becoming steel. Like you tap the furnace, now it's time to take the iron to the open hearth, pick up slag cars, and so on. Dust collection sort of happens on its own. I can pick how often but I gotta find that happy medium where it isn't a nuisance. I suspect I'll just work it out in operation. That's probably the best case.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×