Skip to main content

"Stringing" of an unsuccessful 100 car train

We had run this 100 car train from the top of the BMHR layout to the bottom and I went back to the top of the layout to take a video

of this "victorious" return of the train to the high ground of the fiddle yard. What I got was a great example of the first cars after the loco falling inward on the curve at the top of the layout..."stringing".

This is why running long trains on a complex layout with rises,falls and serpentine curves is so challenging and fun!

 http://www.youtube.com/watch?v=PhdqAe743vA

Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×