The flat is on the layout now. Here's the final stages for the most part:
And finally, on the layout with the loading ramp:
I still plan on adding:
- A couple of small signs along the front (including hours of operation and what draft classifications of men are being hired)
- Bird poop and a couple of scale magazines on the roof
- Minor clutter/weathering along the loading dock
But for the most part, it's done.