Skip to main content

Reply to "Subway Layout 2.0 Progress (Video Added)"

More track down.  Also showing what will be the ramp for the elevated section.  This is a temporary make shift ramp and it shows the elevation to the street level (6 inches).  The ramp will then increase another 6 inches to the elevation above street level.  Notice the track leading to the yard as it passes underneath the ramp.  The grade is approximately 4 percent.  Also note the crossover track design.

20141222_224452_resized

20141222_224500_resized

20141222_224509_resized

20141222_224523_resized

20141222_224540_resized

20141222_224552_resized

20141222_224934_resized

20141222_224942_resized

Attachments

Images (8)
  • 20141222_224452_resized
  • 20141222_224500_resized
  • 20141222_224509_resized
  • 20141222_224523_resized
  • 20141222_224540_resized
  • 20141222_224552_resized
  • 20141222_224934_resized
  • 20141222_224942_resized

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×