Skip to main content

Reply to "Subway Layout 2.0 Progress (Video Added)"

Joe P posted:

Thank you.

I know there are those who have done 2 rail with a working 3rd rail. That is very impressive work indeed. Others have converted the trucks to work on 2 rail thereby eliminating the center rail. I decided against any train or rail modifications and focused on the modeling aspect as well as signaling.

Hhmm if there was a way to route the pick up roller wire to the outside of the truck and attach it to a (contact shoe) one could have a working 3rd rail and keep the protosounds system in tact.....

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×