It's been a while, but I have been working on the layout. Just tedious wiring under tables. Finally got the wiring to the transformer table to get trains running again. There are 28 bus wires, 3 +/-5VDC (6), 6 train lines +/- 0-22 VAC (12), 6 trickle 12VAC power lines (6), 1 Switch Controller line +/-18VAC (2), and 2 express directional indicators. Here is a sample of what is being done. Note this wiring does NOT include signal logic nor switch controllers.
Here is the basically completed Baltic Street station. Note the not yet operational signals. TRAINS ARE RUNNING AGAIN!!! Videos coming soon.