Skip to main content

Reply to "Subway Layout 2.0 Progress (Video Added)"

Sometimes I feel that I have a hard time getting things done.  Nevertheless here is another update showing signal placement and some tunnel walls with 3rd rail.

20170515_231340_00120170515_23140920170515_231430

Attachments

Images (3)
  • 20170515_231340_001
  • 20170515_231409
  • 20170515_231430
Last edited by Joe P

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×