Bi-level subway construction showing main line on lower level as it meets ramp to elevated. The ramp is still in the subway on this module. There will be a building similar to the one containing the tunnel portals where the IND heads out of the subway toward Smith 9th streets. The connecting module will have a ramp in a cutout as is heads toward a Duel Contracts El. Fun stuff, but difficult.
This is the main line subway with ramp construction to the right.
Main line subway below and ramp under construction.