Skip to main content

Reply to "Subway Layout 2.0 Progress (Video Added)"

Subway ramp to tunnel portals under construction. Portals will be part of a substation building placed over the solid wood tunnel walls. The tunnel entrance roadbed is 6.75 scale feet higher than the main subway roadbed. The ramp will continue in a cutout until it rises to 8 scale feet above ground (32 scale feet above the main subway roadbed) where it will meet a standard dual contracts El. Also shown is the El constructed 6 years ago using Plastruct. It is sturdy but I may want to construct the girders with another material, possibly Masonite.

20190204_22294120190204_22304020190204_22325720190204_22365420190204_22383520190204_223847

Attachments

Images (6)
  • 20190204_222941
  • 20190204_223040
  • 20190204_223257
  • 20190204_223654
  • 20190204_223835
  • 20190204_223847

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×