Continued working on the peninsula scenery this past week. The second step after applying the scenery base was to break up the smooth top of the hillside. I hot glued small foam chunks to the top edge that will give a more natural back ground appearance once trees are installed:
I then began to install trees over the next few days. Altogether, I refurbished over 400 that I had left over from my previous O gauge hi-rail layout. Two in process photos:
This is what the peninsula looks like with the trees installed: The next step is to clean up all the installation "damage" and move into the more detailed scenicking steps: