Skip to main content

Reply to "Sunday Scenic Showcase July 12,2020"

I doubt I’ll get this finished today so here’s a few more in process pics.  I may just start a thread on it when I get done. 
Got the lettering on (huge pain) then weathered it into the rest of the building. Put the windows in, no glass yet. 

ACAE18D1-693C-4C4C-AA06-F640EA493571

Now on to the elevator shaft. This is scratch built from .060 styrene sheets.

DA9CBD3B-828B-483B-9A83-6A8960057FBE

I skinned it with “cinderblock”

19654227-4A45-42F9-940B-0962C84D9F7A

Broke for lunch at this point so the glue could dry. Need to build the big door and file the corners.

still haven’t figured out how to attach it to the building.... maybe wood blocks or something.

 

 

 

Attachments

Images (4)
  • ED865454-0313-41A2-B872-D5B40535E9E5
  • ACAE18D1-693C-4C4C-AA06-F640EA493571
  • DA9CBD3B-828B-483B-9A83-6A8960057FBE
  • 19654227-4A45-42F9-940B-0962C84D9F7A
Last edited by Boilermaker1

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×