Happy Father’s Day everyone. Really nice work as usual. Alan - using paint rollers came great on the wash system. Peter - I continue to be impressed with your work on those TW kits. Can’t beat your outdoor work station either!
The cornerstone project has been a little slow. I mis-ordered the smaller gooseneck lamps from Evan’s Designs, so no exterior lighting yet. I did receive lettering from Todds Architectural Models and some laser cut railings from another vendor.
A fun moody shot before adding stairs:
Applying the lettering took some patience, but came out well. The stair railing also added some nice detail. Lots of leftovers to add to the scrap box too!
One last thing I did was add magnets to better hold the stair assembly to the building. Sure glue could have worked, but without a layout, I want these items easy to pack away. More magnets will be used to hold shadow box style interiors inside the building flat. More on that part of the project next week
PS - anyone have a favorite vendor for small building signs? My printer is OK, but not sure it makes the cut for small details (signs like visitors must report to office, loading dock 1, etc.)