Skip to main content

Reply to "Sunday Scenic Showcase October 15,2019"

Just finished two building fronts. These are flat. the next 12 behind them have 1 inch sides. Those are painted and need mortar next.

2019-10-12 Building flats 004

2019-10-12 Building flats 005

2019-10-12 Building flats 001

2019-10-12 Building flats 002

I also finished assembly of some industrial tanks. They are to be painted white with Hess logos. The vertical tank is wired for a flashing red beacon.

2019-10-12 Building flats 006

2019-10-12 Building flats 007

Attachments

Images (6)
  • 2019-10-12 Building flats 004
  • 2019-10-12 Building flats 005
  • 2019-10-12 Building flats 001
  • 2019-10-12 Building flats 002
  • 2019-10-12 Building flats 006
  • 2019-10-12 Building flats 007

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×