Skip to main content

Reply to "Sunset 3rd Rail GP9/GP7"

brwebster posted:

Looking back over figures given in Pennsy Power II, seems as if there may have potentially been 8 GP7's so equipped.  Eight were equipped with steam boilers so moving reservoirs up top to accommodate a larger fuel tank was certainly possible.

Bruce

Unfortunately. Only three GP7's had rooftop torpedo tubes, DuaL Cab Controls,  and cab signaling boxes underneath #8551-8553.

From the Paul Withers book "Pennsylvania Railroad Diesel Locomotive Pictorial" Vol#8.

The Devil is in the details!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×