Skip to main content

Reply to "Switcher Saturday 01-16-21!"

TALES OF THE DOCKSIDER

Oh no!   Another Saturday, another mishap in the Worcester yard.  The yardmaster’s stellar safety record is in jeopardy!

Today NYC RS1 8106 has derailed.  The cause of the derailment is uncertain at this time, although a loose rail joint is suspected.  This was, fortunately, a low speed incident, so there were no injuries.

NYC shop switcher X-8688 was dispatched to tow the “big hook” to the scene.  This will be light work for the hook, so the RS-1 should be re-railed shortly.


jhz, love your 0-4-0 and happy birthday Stephen!

John

9C15E2AD-319D-4A2E-A160-7D4C40EBC34D

Attachments

Images (1)
  • 9C15E2AD-319D-4A2E-A160-7D4C40EBC34D

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×