Skip to main content

Reply to "Switcher Saturday: 2019-Jul-20"

Yay! SWSat is on. 

We are off to a nice start this very warm week. Thanks Rich. 

I was trying to see if a nicely built two rail O Scale  Varney B&O B18 4-6-0 would fit on my small switching layout. It will not make my tight track work. I mainly got it because it was well detailed and I thought I could learn how to make my own efforts better. The added wire soldiered around the cab and tender edges I have not seen it done before but  the engine wheel brakes are positionable.  It still need a few things like handrails. 

B757F591-B734-4BA1-A551-1BD63855F89A2472DE88-F57C-443E-8606-2962770297CC

On the NYSME layout here is a little preview of a big switchable industry project I am working on. Last week I cut a lot of windows in the new huge coal breaker we are building as well as the supporting trestle on the loader. We designed the huge building to wrap around a problematic support column  so visually it take up a lot of space but functionally it is a facade that on the ground takes 4 inches along one side. When it is done there will be 4 coal loading tracks, a rock waste loading track and a supply and service track. Track is still going in at a quick pace and I can add the last support legs this week when the rails get laid and spiked.

4CBFBFB0-1719-4FC5-AE99-56DE690301C35FB47BEE-6C68-49B5-8509-1BB21D75CB5B

Have a great weekend guys. I can’t wait to see what you guys post. 

Attachments

Images (4)
  • B757F591-B734-4BA1-A551-1BD63855F89A
  • 2472DE88-F57C-443E-8606-2962770297CC
  • 4CBFBFB0-1719-4FC5-AE99-56DE690301C3
  • 5FB47BEE-6C68-49B5-8509-1BB21D75CB5B
Last edited by Silver Lake

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×