Skip to main content

Reply to "Switcher Saturday- Mark II, 8-24-19"

geysergazer posted:

Gonna daylight this tunnel...

             

...because with the latest track-plan tweak switching the paint factory has the engine buried in the mountain for most moves and that is decidedly un-prototypical. Can't have the crew being asphyxiated 

       IMG_3750

A pic to clarify the tunnel position:

         IMG_3756

Attachments

Images (1)
  • IMG_3756

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×