Skip to main content

Switching?

I have noticed the in a lot of articles that tinplate layouts  are just simple loops and have no switches for intricate switching. Is it more common to just use simple loops or do you like to do switching or have a spur or a side track passing spur.

Do the engines have trouble with the front trucks on switches.  

I don't believe in lots of switches, but like occasional sidings, thinking about adding one to my Standard gauge loop.

BTW. I'm using standard  gauge track. 

Thanks.

Last edited by Jushavnfun
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×