Skip to main content

Reply to "TAML One-A-Days: Sunday, March 31, 2024, T-18: Evergreen Scale Styrene Sidewalk Sheet 1" x1" Custom Run"

@CAPPilot posted:

Nice.  There are way too few building fronts available with a loading dock and large doors.  A little deeper one then pictured would be great.  What is the distance required between the wall and center rail of the track for the ones you have now?

Ron;

I have a wall of Doug’s shadowboxes - here is one that was a one-off a couple of years ago, but is based on the leftmost building in the pic above.

IMG_2592

The dock sits app. 2 1/4” proud of the back wall.

IMG_2590

I use Fastrack, and have no problems running any engine or rolling stock with the center rail app. 4 7/8” from the back wall (including a BigBoy and 21” passenger cars).

IMG_2591

Hope this helps.

Attachments

Images (3)
  • IMG_2592
  • IMG_2590
  • IMG_2591

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×